Entrepreneurship based on Intermodal Transport for the Installation of a Wind Turbine in Isolated Regime

Publication date: 2018Source: Procedia - Social and Behavioral Sciences, Volume 238Author(s): Tămăşilă Matei, Ruşet Patriciu, Diaconescu AndraAbstractThe complex activities for the implementation of renewable energy projects (RES) need a well-documented entrepreneurial plan to find qualified suppliers for the development of RES projects. The activities of the chain links in RES projects, respectively, the transport of heavy components, require a collaborative logistics system to be continually monitored. The requirements stringency imposed for the implementation of wind energy projects inevitably implies infrastructure, implementation and logistical constraints. Special parts of the wind turbine can be difficult to handle due to their fragility, weight or size and therefore it requires special treatment when transported. This work, based on the Analytic Hierarchy Process (AHP) method, respectively through a decision model provides an entrepreneurial plan for the intermodal transport needed to assembly a wind turbine in isolated regime, where there are challenges related to the high transport distance, low road standard and rough climate.
Source: Procedia Social and Behavioral Sciences - Category: Psychiatry & Psychology Source Type: research
More News: