Installation of River Campus structure begins with delivery of first of 19 prefabricated modules

One of the largest barge-mounted cranes on the East Coast will lift the extension’s structural skeleton into place, one section at a time. For safety reasons, the FDR Drive and East River Esplanade will be closed during lift operations, which will occur this summer during overnight hours. More »
Source: The Rockefeller University Newswire - Category: Biomedical Science Authors: Tags: Campus News campus construction Marie-Josée and Henry R. Kravis Research Building Stavros Niarchos Foundation–David Rockefeller River Campus Source Type: news